![]() The three-storey structure forms a 178-room, four-star boutique hotel and spa facility with five-star suites on the top floor, which caters for delegates and visitors to the 900 events that are held at the National Exhibition Centre annually as well as leisure guests visiting the West Midlands region.Īs Metframe is assembled offsite to form easy-to-erect panels, the full frame could be delivered to the contractor in the required erection sequence and simply bolted together on location. Metframe was chosen as the structural solution to enable quick and efficient construction of the top three storeys of the complex. The £150m Resorts World development, which was built by main contractor Galliford Try, offers a unique 55,000sqm leisure and entertainment complex inclusive of a hotel, spa, casino, 50 retail outlets, a wide range of restaurants and bars and a multi-screen IMAX cinema and is located on the NEC campus in Solihull. The UK’s largest specialist lightweight structural steel manufacturer, Metsec has supported the construction of Genting UK’s new Resorts World complex in Birmingham by supplying its pre-panelised steel framing system, Metframe. Genting UK Uses Metframe to Deliver High Quality Structural Solution at Birmingham Leisure and Entertainment Complex ![]() ![]() ![]() Purlins & Side Rails Purlins & Side Rails. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |